TSI is proud to announce that it has added 40MW to Bazergan Power Station where we recently completed the supply and installation of critical spare parts for two FT8 units supplied by PW Power ... See more

LIKE
LOVE
HAHA
WOW
SAD
ANGRY
10 months ago

TSI has finalized negotiation with its partner in Ghana DTSI to supply them with transformer cores and clamps for their newly built transformer manufacturing facility in Ghana under the name of ... See more

LIKE
LOVE
HAHA
WOW
SAD
ANGRY
11 months ago

TSI has successfully negotiated a contract with SERCO to supply spare parts for Hawker Siddeley Switchgear main DC circuit breakers that operates the famous Dubai Metro System.

LIKE
LOVE
HAHA
WOW
SAD
ANGRY
11 months ago

TSI completed the supply, installation, and commissioning of the 11kV medium voltage switchgear for DEWA 132/11kV substation. The switchgear is utilized for distribution of electrical power to ... See more

LIKE
LOVE
HAHA
WOW
SAD
ANGRY
11 months ago

TSI finalized the order with Mass Group Holdings to supply various spare parts for their Brush Electrical Machines Generators that are installed and currently providing power to Sulaymaniah Province ... See more

LIKE
LOVE
HAHA
WOW
SAD
ANGRY
1 year ago
Ramadan Kareem

We wish you and your family countless blessings this #ramadan #RamadanKareem from TSI!

LIKE
LOVE
HAHA
WOW
SAD
ANGRY
1 year ago
Happy Holidays from TSI!

Happy Holidays from TSI!

LIKE
LOVE
HAHA
WOW
SAD
ANGRY
1 year ago
Photos from Technical Solutions to Industry Fze's post

Day three of Abu Dhabi International Petroleum Exhibition and Conference (ADIPEC) 2018, with our Business Development Director and Capstone Turbine team #ADIPEC2018

LIKE
LOVE
HAHA
WOW
SAD
ANGRY
1 year ago

We are excited to announce that we have now moved to The Opus by Zaha Hadid Tower in Business Bay. The main telephone and facsimile numbers remain unchanged.

We look forward to welcoming you to our ... See more

LIKE
LOVE
HAHA
WOW
SAD
ANGRY
1 year ago
Eid Mubarak!

We wish you a season full of peace, joy, and happiness! Eid Mubarak!

LIKE
LOVE
HAHA
WOW
SAD
ANGRY
« 1 of 5 »

TSI has successfully completed the designing, #Manufacturing and #testing of fire and gas detection, CO2 flooding safety system containerized solution for two @CapstoneTurbine C600S Microturbine packages.

3

May the festive season be filled with love and joy. Happy #holidays from TSI! #holiday2019 #oilandgas #UAE

TSI has successfully completed the #installation and commissioning of Brush Switchgear Ltd Retrofit breakers for Suez #Oil Company in Egypt. The scope of work includes removing the old spring mechanism type breakers..https://t.co/o8qARim02F

3

TSI has successfully delivered a state-of-the-art Produced Water Treatment System (PWTS) for an #Oil Producer and Operator in Iraq. The system is capable of treating up to 1000 cubic meter per day of produced water with high HSS and H2S values. Read more https://t.co/pGfUOet5Mr

3

TSI demonstrates its great capability to manage a complex modification work on eight reformer convection modules, each modules weighing from 50 to 80 ton in Southern #Iraq. The project was awarded in August and is due for completion by end of November 2019.

Load More...
November 21, 2019

TSI completed the Installation and Commissioning of Retrofit Breakers for Suez Oil Company in Egypt

TSI has successfully completed the installation and commissioning of Brush Switchgear Ltd Retrofit breakers for Suez Oil Company in Egypt. The scope of work includes removing […]
November 7, 2019

TSI has successfully delivered a State-of-the-art Produced Water Treatment System for an Oil Producer and Operator in Iraq

TSI has successfully delivered a state-of-the-art Produced Water Treatment System (PWTS) for an Oil Producer and Operator in Iraq. The system is capable of treating up […]
October 6, 2019

TSI secured an order to provide 1.2 megawatts (MW) of Energy in the Basra Region

TSI secured an order to provide 1.2 megawatts (MW) of energy to power a triethylene glycol (TEG) dehydration facility in the Basra region of Southern Iraq. […]
August 29, 2019

TSI added 40MW to Bazergan Power Station

TSI is proud to announce that it has added 40MW to Bazergan Power Station where we recently completed the supply and installation of critical spare parts […]
August 29, 2019

TSI completed the supply, installation, and commissioning of the 11kV medium voltage switchgear for DEWA 132/11kV substation.

TSI completed the supply, installation, and commissioning of the 11kV medium voltage switchgear for DEWA 132/11kV substation. The switchgear is utilized for distribution of electrical power […]
July 21, 2019

TSI has successfully negotiated a contract with SERCO

TSI has successfully negotiated a contract with SERCO to supply spare parts for Hawker Siddeley Switchgear main DC circuit breakers that operates the famous Dubai Metro […]
June 26, 2019

TSI finalized the order with Mass Group Holdings

TSI finalized the order with Mass Group Holdings to supply various spare parts for their Brush Electrical Machines Generators that are installed and currently providing power […]