Oil and Gas Projects – Completed

Show all

Oil and Gas Projects – Completed

Commissioning of Thermal Oxidixer

Client's Name : Fives Group
Start Date : 2023
Completion Date : 2023
Location: West Qurna 2, Iraq

Review and checking of Engineering drawings, perform site walk-down for DS6 MTI Degassing Station

Client's Name : Saipem
Start Date : 2022
Completion Date : 2023
Location: West Qurna 1, Iraq

Survey for preservative works for vessels, pumps, equipment at KM500 Project Site

Client's Name : Pearl Petroleum Company
Start Date : 2022
Completion Date : 2022
Location: Khormor LPG Plant, Iraq

Completion of Remaining electrical works for Produced Water 1 (PW1) at DS6

Client's Name : Wood/ExxonMobil
Start Date : 2022
Completion Date : 2022
Location: West Qurna 1, Iraq

Refurbishment of 11,000 M3 tanks - semi finished two float roof crude oil tanks

Works include technical evaluation of tank integrity, design and construction of float roof rim seal, complete shell and roof welding, firefighting and foam system, tank nozzles, earthing system, lightning, lights, radar level, mixers, heaters, hydrostatic testing and painting

Client's Name : Sonangol Iraq
Start Date : 2021
Completion Date : 2021
Location: Qaiyarah Refinery, Iraq

Electrical infrastructure design study - Data Collection, develop GIS drawing, the SLD of the 11KV feeder, power quality analysis, load flow analysis

Client's Name : Sonangol Iraq
Start Date : 2021
Completion Date : 2021
Location: Qaiyarah Oil Field, Iraq

Electrical & Instrumentation Works for WB91 oil blending process

Client's Name : Sonangol Iraq
Start Date : 2021
Completion Date : 2021
Location: Qaiyarah Oil Field, Iraq

Piping Works Services-Condensate and firefighting pumps and pipe network

Client's Name : Aggreko Middle East Limited FZE
Start Date : 2021
Completion Date : 2021
Location: Kalar Power Station, Iraq

Piping Works Services-Platform Gas Piping, reduction stage and distribution of gas fuel piping

Client's Name : Aggreko Middle East Limited FZE
Start Date : 2021
Completion Date : 2021
Location: Kalar Power Station, Iraq

Fabrication and Installation of North Degassing Station

Piping and mechanical works include crude oil piping, Naphtha Decanting Facility, Naphtha transfer facility, modification on existing tanks, installation of pumps and firefighting network

Client's Name : Sonangol Iraq
Start Date : 2020
Completion Date : 2021
Location: Iraq

Supply and Construction of Cooling Water System, Firefighting System, Gas Pipe Work and Skids, Fire and Gas System for 165 MW Power Station at Kalar Oil Field

Client's Name : Aggreko Middle East Limited FZE
Start Date : 2020
Completion Date : 2021
Location: Kalar Oil Field, Iraq

Transportation of 8 Reformer Convection Modules Work from IEC to Khor Al Zubair

Client's Name : Mitsubishi Corporation
Start Date : 2020
Completion Date : 2020
Location: Iraq Energy City

Modification of 8 Reformer Convection Modules Work

Client's Name : Mitsubishi Heavy Industry
Start Date : 2019
Completion Date : 2020
Location: Iraq Energy City

Modification of 8 Reformer Convection Modules Work

Client's Name : Mitsubishi Heavy Industry
Start Date : 2019
Completed
Location: Iraqi Enery City

Supply of two 600 KW Capstone Turbines / 1.2 MW Micro GTG Package including Pulse Jet Air Pre-filtration and Fire Suppression System

Client's Name : Basrah Gas Company
Start Date : 2019
Completed
Location: Hammar Permanent TEG Dehydration Facility

Electrical, Instrumentation, Control and Mechanical Commissioning Works

Client's Name : Wood / ExxonMobil
Start Date : 2015
Completed
Location: West Qurna 1

Complete Electrical and Mechanical Installation and Commissioning Works

Client's Name : BUTEC
Start Date : 2019
Completion Date : 2020
Location: Umm Qasr

Instrumentation and Commissioning Works

Client's Name : Wood/BGC
Start Date : 2018
Completion Date : 2018
Location: Hammar Mishrif

Engineering and Supply of Produced Water Treatment System

Client's Name : Gazprom
Start Date : 2018
Completion Date : 2019
Location: Badra Oilfield

EPC of 11kV Overhead Line at Badra Oil Field Iraq

Client's Name : Gazprom NEFT Badra Iraq
Start Date : 2016
Completion Date : 2017
Location: Badra Oilfield

Complete Electrical and Instrumentation Works

Client's Name : Weatherford Iraq BV
Start Date : 2014
Completion Date : 2015
Location: Zubair Oilfield

Complete Electrical and Instrumentation Works

Client's Name : Weatherford Iraq BV
Start Date : 2014
Completion Date : 2016
Location: Rafidiya Oilfield

Electrical, Process and Mechanical Commissioning Works

Client's Name : Weatherford Iraq BV
Start Date : 2013
Completion Date : 2014
Location: Garraf Oilfield

Supply and installation of six compact substations at Garraf Oilfield

Client's Name : Petronas Carigali Iraq
Start Date : 2012
Completion Date : 2014
Location: Garraf Oilfield